Nawnit Kumar Sharma
Email: nawnitsharma@gmail.com
Ph – 7439466074, 08016077540
Objective & Purpose of the Job:
To work in a challenging and creative environment and effectively contribute towards the goals of the organization.
Our position is responsible for getting EC for Green-field and Brown-field projects, Renewal of CTO and
other environment related licence, field work, documentation, report preparation for ensuring statutory
compliance to all applicable environmental acts and laws and ISO 14001 clauses to the organization and
coordinating for related activities thereof with MoEF&CC, SPCB, CGWA, SWID and other agency.
Professional Experience
1) Organization : Rungta Steel Ltd.
Designation : Senior Manager Environment
Period : Dec’23 to Till now.
Posted at : Chaliyama Steel Plant, Chaibasa, Jharkhand
2) Organization : Shyam Sel and Power Ltd., W.B
Designation : Senior Manager Environment
Period : May 2023 to Dec’23.
Posted at : Kolkata (HO), W.B
3) Organization : Ambuja Cement Limited, Sankrail and Farakka, W.B.
Designation : Associate Manager Environment
Period : Nov 2009 to April 2023.
Posted at : Farakka Unit, W.B
4) Organization : Bhagavathi Ana labs Limited, Hyderabad.
Designation : Environmental Scientist
Period : May 2007 to Nov 2009.
Posted at : Raipur Branch
Key Performance Areas:
To ensure timely Environmental Clearance and FC for any new projects and expansion
projects
Submission all Compliance Report and return (CTO, EC, FC, CGWA, HWM, Battery Waste, E-
Waste,Bio-med Waste) yearly and half yearly to statutory bodies to fulfill the quality objectives,
review the reports, compliance advice and monitoring
To ensuring strict adherence to Environmental Protection Act, 1986, Water Act 1974, Air Act 1981,
E waste & Hazardous Wastes Mgt. & Handling Rules, The Factories Act and Rules.
To document, report preparation and submission as per statutory compliances
To monitor and record all statutory parameters.
To ensure smooth operation of all equipment and system (ETP & STP) which comes under
the purview of EC, CTE and CTO.
To conduct of environmental (ISO 14001) and IMS audit in the unit.
To liaison with statutory authorities State Pollution Control Board, State Water Investigation
Department, Central Pollution Control Board and Ministry of Environment and Forest for
Environmental Clearances.
Maintaining Water Balance - Monitoring of water withdrawal & consumption at various
location inside plant and colony area.
Responsibilities:
Present: At Rungta Mines Limited (CSP)
• To ensure strict adherence with all the conditions laid in EC, CTE and CTO for operational
integrated plant and expansion project (from 2.88 to 7.01 MTPA). Total area 559.5 Hectare.
• To ensure efficient monitoring and data connectivity to CPCB/SPCB for all air monitoring
location (06 nos. CAAQMS).
• To ensure efficient monitoring and data connectivity to CPCB/SPCB for all stack emission
monitoring system (12 nos. CEMS).
• To ensure efficient monitoring and data connectivity to CPCB/SPCB for on-line ETP (1000
KLD) monitoring system (01 no.).
• To ensure timely installation of new CAAQMS (04 nos.) and CEMS (08 nos.) for the
expansion project before getting CTO
• To ensure renewal of licenses as per SPCB
o To ensure regular preparation and submission of data to SPCB, CGWA,
CPCB and MoEF&CC.
o To follow up and liaison with local and state authorities for licenses,
authorizationsand renewal of permissions.
• To ensure monthly submission of fly ash generation and consumption report on CPCB Ash
portal
• To prepare miscellaneous reports related to environment, reply to official letters from
regulatory authorities.
• To prepare and submit various monthly, quarterly and yearly reports to the various
government regulatory authorities such as SPCB, CPCB, CGWA and MoEF&CC
• To ensure smooth operation and maintenance of ETP (1000 KLD), STP (600 KLD) and
Vacuumed Based Sweeping Machines (04 nos.) and Water Sprinklers
EC Projects: Shyam Group
Getting EC for new and Expansion Project.
Seven nos of various EC projects (New & Expansion) in West Bengal, Jharkhand and MP
One Amendment in EC from MoEF&CC for Name Change
NIPL Certification for Change in Fuel Mix from SPCB
ESG - Scope 1, 2 and 3 data verification (for ESG Performance) and Comply with
SEBI Sustainability Reporting (BRSR)
Supervision for obtaining the FC for Expansion Project viz. FC Stage 1 with forest diversion proposal
including guidance for obtaining the recommendation letter of ACF & IRO letter for FC Stage 1
Certificates. Similarly, obtained FC Stage 2 with CA Land payments details, FRA certificate from
DFO and Final FC Certificates
At Ambuja Cements Ltd.
Ambuja Cements Ltd., Unit – Farakka for Expansion Project from 1.25 to 3.0 MTPA
fromSEIAA, West Bengal.
NIPL Certification for Production Capacity Enhancement from 1.25 to 1.5 MTPA
Barh Project (Greenfield), (New Proposed 5.0 MTPA Cement Plant at Barh, Patna) from
SEIAA, Bihar.
Ambuja Cements Ltd., Unit – Sankrail (Howrah) for Expansion Project from 2.4 to 4.0
MTPAfrom MoEFCC.
Kharagpur Project (Greenfield). (New Proposed 6.0 MTPA Cement Plant at Kharagpur,
WB) from SEIAA, WB
Monitoring
Ambient Air Monitoring
• Ambient Air Monitoring (PM 10 & PM 2.5, SO2, NOX). Spot measurement by High Volume
Air Sampler & Personal Sampler.
• To ensure efficient monitoring at all air monitoring location on particular interval of time.
• CAAQMS data monitoring and its maintenance.
Stack Monitoring
• To ensure efficient monitoring of Cement Mill Stack, Packer Stack and Wagon Tippler
Stack on timely basis.
• CEMS data monitoring and its maintenance.
• To communicate records with Pollution Control Board on timely basis.
CO2 Monitoring
• To ensure efficient monitoring of CO2 generation (Absolute CO2 & Specific CO2) by our
own on-site vehicle, Rail and DG Set.
Noise Monitoring
• To ensure proper monitoring of noise at 22 location (ambient & work zone) on monthly
basis through a portable noise measurement device and reporting to the concerned
department.
Water Monitoring
• Drinking Water & Ground Water Analysis
• To analyse drinking water quality (IS 10500: 2012) of plant and colony area and reporting to
the State Pollution Control Board.
• Waste Water Analysis
• To analyse waste water quality (COD, BOD, TDS, O&G, pH) of plant and colony area and
reporting to the State Pollution Control Board.
Compliances
• To ensure compliance for all applicable statutes of Air, Water, Noise and Waste Water
• To ensure renewal of licences as per State Pollution Control Board
o To ensure regular preparation and submission of data to State Pollution Control
Board, State Water Investigation Department, Central Pollution Control Board and
Ministry of Environment and Forest.
o To follow up and liaison with local and state authorities for licences, authorizations
and renewal of permissions.
• To obtain consent under Air and Water Acts for Cement Plant.
• To prepare miscellaneous reports related to environment, reply to official letters from
regulatory authorities.
• To ensure proper conduct of IMS audit (ISO 14001)
MIS
• To ensure data, generated report regarding stack emission and others as per timelines
• To prepare and submit various monthly, quarterly and yearly reports to the various government
regulatory authorities such as State Pollution Control Board, State Water Investigation
Department, Central Pollution Control Board and Ministry of Environment and Forest
• To prepare monthly compliance report.
• To ensure all documentation related to ISO 14001 guideline
Unit Sustainable Steering Committee (USSC)
• Heading USSC at plant level. Conducting meeting on monthly basis, discussing issues and it
mitigation.
Maintaining Water
Balance
Monitoring of water withdrawal & consumption at various
location inside plant and colony area.
Monitoring & Maintenance of Dedusting Equipments (Bag Filters)
Operation & Maintenance of R.O Plant
Horticulture & Housekeeping
• Horticulture activities inside plant and colony area.
• To ensure 33% of green coverage inside plant as per statutory requirement.
• Development of Eco-Parks inside plant and its maintenance.
• Beautification inside Plant & Colony Premises by planting seasonal flowers and decorative
plants.
Educational Qualification:
Master of Science – Master of Sciences in Environmental Sciences from A.N. College Patna.
Bachelor of Science – Environmental and Water Management from J.N.College, Ranchi, Jharkhand.
12th form B.I.E.C -Patna.
10th from CBSE, Patna
Academic Projects:
“Drinking Water Quality Analysis” at Central Mine Planning and Development Institute Ltd., Ranchi, for
the period of 2 months.
“Milk and Water Quality Analysis” at Sudha Dairy, Ranchi for the period of 1 month.
Project Development on “Present Status of Industries” at Ranchi in the year of 2004.
Prepared Visit report on “Sewage Treatment Plant” at MECON, Ranchi.
05 months technical training at STP- Bihar Jal Parshad, Beur, Patna
Short Term Development Program from Narsee Monjee Institute of Management Studies, Mumbai
YLDP from IIM Indore in 2017
Personal Information:
Fathers Name A. Kumar
Date of birth
Nationality
15 April 1981
Indian
Gender Male
Languages Known English, Hindi
Marital Status
Permanent Address
Married
C/O- Mr. A. Kumar
Near Bank of India.
Garikhana
Khagaul (Patna) – 801105
Bihar
Declaration:
I hereby declare that whatever information furnished above is true to the best of my knowledge.
Yours
Nawnit Kumar Sharma